PH6.5 — Playwright end-to-end suite, nightly on develop #46

Open
opened 2026-09-11 09:02:19 +00:00 by bart · 0 comments
Collaborator

Parent

Row PH6.5 in docs/12-implementation-plan.md (branch, owned paths and doc section are defined there).

What to build

A Playwright suite drives the compose stack through the golden path — login, seed, nightly run, triage, publish, technician feedback — and runs nightly on develop.

Acceptance criteria

  • E2E suite passes locally against the compose stack
  • Nightly workflow runs it on develop and reports failures
  • Covers S04, S06, S07 end to end

Blocked by

  • #8 — CI pipeline: backend, frontend, generated-file freshness, single Alembic head, commitlint
  • #28 — Plan board publish dialog, discard, and runs page P04
  • #30 — Today page P09, mobile-first
## Parent Row **PH6.5** in `docs/12-implementation-plan.md` (branch, owned paths and doc section are defined there). ## What to build A Playwright suite drives the compose stack through the golden path — login, seed, nightly run, triage, publish, technician feedback — and runs nightly on `develop`. ## Acceptance criteria - [ ] E2E suite passes locally against the compose stack - [ ] Nightly workflow runs it on `develop` and reports failures - [ ] Covers S04, S06, S07 end to end ## Blocked by - #8 — CI pipeline: backend, frontend, generated-file freshness, single Alembic head, commitlint - #28 — Plan board publish dialog, discard, and runs page P04 - #30 — Today page P09, mobile-first
Sign in to join this conversation.
No labels
ready-for-agent
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
patrick/Polaris#46
No description provided.